β’ Transformer oil filtration
β’ OLTC oil filtration
β’ Moisture and impurity removal
β’ Vacuum dehydration process
β’ Oil quality improvement and conditioning
β’ Pre- and post-filtration testing
β’ Service report submission
β’ Technician/Engineer labor charges
β’ Oil filtration equipment and services
β’ Standard testing before and after filtration
β’ Service report and recommendations
β’ Cost of new transformer or OLTC oil
β’ Oil replacement or top-up oil (if required)
β’ Repair or replacement of transformer/OLTC components
β’ Transportation and shutdown arrangements
β’ βΉ10,000 β βΉ75,000 per transformer (depending on capacity and oil quantity)
β’ Site Inspection Charge: βΉ1,000 β βΉ5,000 (adjustable if work proceeds)
β’ Final cost depends on transformer rating, oil volume, site conditions, and filtration requirements
β’ Customer must provide safe access and transformer shutdown arrangements.
β’ New oil, oil replacement, or oil top-up (if required) will be charged separately.
β’ Any repair or maintenance work identified during service will be quoted separately.
β’ Service charges may vary based on transformer capacity, oil quantity, and site conditions.
β’ ELTO is not responsible for pre-existing transformer defects or internal equipment failures.
β’ Test results and technical recommendations provided by ELTO shall be considered final.
β’ Payment must be completed upon service completion unless otherwise agreed.