β’ Installation of HT panels (11kV/33kV)
β’ Panel positioning, alignment, and mounting
β’ Busbar and cable termination connections
β’ Testing and commissioning
β’ Safety and functionality checks
β’ Technician labor charges
β’ Installation and commissioning services
β’ Testing and basic safety verification
β’ Minor consumables required for installation
β’ Cost of HT panels and accessories
β’ Transformers, cables, switchgear, and protection devices
β’ Civil work (foundation, trenching, wall cutting, structural modifications)
β’ Government approvals, permits, and statutory fees
β’ βΉ25,000 β βΉ50,000 per panel installation (excluding materials)
β’ Site Inspection Charge: βΉ2,000 β βΉ5,000 (adjustable if work proceeds)
β’ Final cost depends on panel rating, site conditions, and project complexity
β’ Customer must provide HT panels, accessories, and approved drawings.
β’ All materials and equipment will be charged separately unless specifically included in the quotation.
β’ Additional work beyond the agreed scope will be quoted separately and executed only after approval.
β’ Service charges may vary based on site conditions, accessibility, and project requirements.
β’ Government approvals, inspections, and statutory charges are not included.
β’ ELTO is not responsible for equipment defects, manufacturing faults, or pre-existing site issues.
β’ Inspection findings and final technical assessment will be considered final for execution.
β’ Payment must be completed as per agreed project milestones or contract terms.