About the service
ο»ΏScope of Work
- Diagnose faulty switches and sockets.
- Repair or replace defective units.
Ensure proper wiring connections.
Perform functionality and safety checks.
Ensure compliance with electrical safety standards.
What's Included
- Technician service charges.
- Inspection, testing, and commissioning.
- Minor consumables required for service.
What's Not Included
- Cost of switches, sockets, and branded accessories.
- Major rewiring beyond the switch/socket point.
- Civil work, wall cutting, patchwork, or painting.
- Additional electrical modifications.
Service Cost
- βΉ320 β βΉ500 per switch/socket (excluding spare parts).
- Minimum visiting/inspection charge: βΉ199.
Terms & Conditions
- Customer must provide access to the faulty switch/socket location.
- Spare parts and accessories will be charged separately.
- Payment must be made upon completion of the service.
- Any rewiring beyond the switch/socket point will be treated as a separate service and charged accordingly.
- Service charges may vary depending on site conditions and work complexity.
- A minimum visiting/inspection charge of βΉ199 is applicable if the customer chooses not to proceed with the service after inspection.
- Service scheduling is subject to technician availability and serviceable locations.
- The customer must provide a safe working environment and required utility access.
- ELTO is not responsible for pre-existing wiring faults, concealed wiring defects, or issues arising from poor-quality electrical installations.
- Any additional work identified during inspection will be quoted separately and carried out only after customer approval.
- The final inspection report, service recommendation, and decision made by the ELTO Team shall be considered final.
Service Process
Step 1: Request Service
- Share issue details.
- Book the service request.
Step 2: Inspection & Quotation
- Technician inspects the issue and provides a cost estimate.
Step 3: Approval & Service
- Customer approval is obtained.
- Repair or replacement work is carried out.
Step 4: Testing & Handover
- Functional testing is completed.
- Safe usage guidance is provided to the customer.
Step 5: Billing & Payment
- Final service charges are confirmed after completion of work.
- Invoice is generated and shared with the customer.
- Customer makes payment through the available payment methods.
- Service request is closed upon successful payment.
Read More β