Installation & Setup
β‚Ή80.00 starting
Certified Pro

About the service

Scope of Work

β€’ Copper refrigerant piping installation (gas & liquid lines)
β€’ Pipe insulation and sealing
β€’ Drain pipe installation and routing
β€’ Pipe bending, jointing, and alignment
β€’ Pressure testing and leakage check support
β€’ Proper slope setup for drainage flow
β€’ Basic system connectivity support

Covered

β€’ Technician / engineer labor charges
β€’ Copper piping installation and alignment
β€’ Drain line fitting and routing
β€’ Pipe insulation and sealing work
β€’ Basic testing and inspection

Not Covered

β€’ Cost of copper pipes, insulation material, drain pipes, fittings, and accessories
β€’ Core cutting, wall chasing, trenching, or civil works
β€’ Refrigerant gas filling or compressor service
β€’ Electrical wiring or power connection works
β€’ Major structural modifications or height work equipment

Service Cost (Updated for Profitability)

β€’ β‚Ή80 – β‚Ή250 per meter (copper piping + drain line installation, excluding materials)
β€’ Inspection / Visit Charge: β‚Ή299 – β‚Ή599 (adjustable if work proceeds)
β€’ Complex routing / height work: extra β‚Ή500 – β‚Ή2,000
β€’ Final cost depends on pipe length, tonnage, routing complexity, and site conditions

Terms & Conditions

β€’ Customer must provide AC installation readiness and site access.
β€’ Copper pipes, insulation, drain pipes, and fittings will be charged separately unless included in quotation.
β€’ Any additional routing, core cutting, or structural work will be quoted separately.
β€’ Service charges may vary based on pipe length, site conditions, and installation complexity.
β€’ ELTO is not responsible for refrigerant leakage caused by future external damage or improper usage.
β€’ Service scheduling is subject to technician availability and site readiness.
β€’ Inspection findings and final technical assessment will be considered final for execution.
β€’ Payment must be completed after service unless otherwise agreed.

Read More ↓

Service Process

1
Request Service
2
Site Inspection & Assessment
3
Quote & Approval
4
Piping & Drain Installation
5
Testing & Pressure Check
6
Billing & Handover
Book Now β†’ Add to Cart πŸ›’