Installation & Setup
β‚Ή15000.00 starting
Certified Pro

About the service

Scope of Work

β€’ Indoor and outdoor VRV/VRF unit installation
β€’ Refrigerant piping layout and connection (basic installation)
β€’ Drain line installation and routing
β€’ Electrical power and control wiring connection
β€’ System zoning and unit coordination support
β€’ Pressure testing, vacuuming, and commissioning support
β€’ Functional testing and system performance verification
β€’ Safety inspection after installation

Covered

β€’ Technician / engineer labor charges
β€’ Installation and commissioning support
β€’ Basic electrical and control wiring connection
β€’ Testing and system verification
β€’ Minor consumables required for installation

Not Covered

β€’ Cost of VRV/VRF units, controllers, piping materials, and accessories
β€’ Structural work, core cutting, trenching, or civil modifications
β€’ Electrical DB upgrades, HT/LT supply modifications
β€’ Refrigerant gas charging (if additional required beyond OEM supply)
β€’ Cranes, lifts, scaffolding, or heavy lifting equipment
β€’ System design engineering (unless separately contracted)

Service Cost (Updated for Profitability)

β€’ β‚Ή15,000 – β‚Ή75,000 per system (depending on tonnage and zones)
β€’ Inspection / Visit Charge: β‚Ή699 – β‚Ή1,499 (adjustable if work proceeds)
β€’ Height / crane / heavy installation support: extra β‚Ή3,000 – β‚Ή15,000
β€’ Final cost depends on system capacity, number of indoor units, piping length, and site complexity

Terms & Conditions

β€’ Customer must provide approved VRV/VRF design and site readiness before execution.
β€’ Units, piping materials, controllers, and accessories will be charged separately unless included in quotation.
β€’ Any design changes, additional piping, or structural work will be quoted separately.
β€’ Service charges may vary based on system complexity, height, and site conditions.
β€’ ELTO is not responsible for manufacturer defects, gas leakage issues, or OEM design limitations.
β€’ Service scheduling depends on technician availability and project coordination.
β€’ Inspection findings and final technical assessment will be considered final for execution.
β€’ Payment must be completed as per agreed milestone or service terms.

Read More ↓

Service Process

1
Request Service
2
Site Survey & System Assessment
3
Design Review & Approval
4
Installation & Execution
5
Testing & Commissioning
6
Handover & Billing
Book Now β†’ Add to Cart πŸ›’