β’ Cassette / tower AC unit installation and positioning
β’ Ceiling mounting support and alignment (cassette AC)
β’ Electrical connection and power load check
β’ Drain pipe connection and routing
β’ Refrigerant piping connection (basic installation)
β’ Functional testing and cooling performance verification
β’ Safety inspection after installation
β’ Technician / engineer labor charges
β’ Installation and fitting services
β’ Basic electrical connection support
β’ Testing and commissioning
β’ Minor consumables required for installation
β’ Cost of AC unit, indoor/outdoor accessories, brackets, and supports
β’ False ceiling cutting, structural fabrication, or major civil work
β’ Electrical new wiring or DB upgrades
β’ Refrigerant gas charging or leakage repair (unless specified)
β’ Crane, scaffolding, or lifting equipment (if required for height work)
β’ βΉ4,000 β βΉ12,000 per unit (standard installation, excluding materials)
β’ Inspection / Visit Charge: βΉ399 β βΉ699 (adjustable if work proceeds)
β’ Height work / crane requirement: extra βΉ1,500 β βΉ5,000
β’ Final cost depends on tonnage, site height, piping length, and complexity
β’ Customer must provide safe access and installation readiness of site.
β’ AC unit, supports, pipes, accessories, and consumables will be charged separately unless included in quotation.
β’ Any structural modification, false ceiling cutting, or additional work will be quoted separately.
β’ Service charges may vary depending on site conditions, height, and installation complexity.
β’ Service scheduling is subject to technician availability and serviceable locations.
β’ ELTO is not responsible for manufacturer defects, cooling issues, or pre-existing AC faults.
β’ Inspection findings and final technical assessment will be considered final for execution.
β’ Payment must be completed after service unless otherwise agreed.