β’ Busbar installation and interconnections
β’ Bus duct and busbar support installation
β’ Protection relay installation and configuration
β’ CT, PT, and metering connections
β’ Control wiring and protection circuit integration
β’ Testing, commissioning, and safety checks
β’ Engineering and technician labor charges
β’ Installation and commissioning services
β’ Testing and basic safety verification
β’ Minor consumables required for service
β’ Cost of busbars, bus ducts, relays, CTs, PTs, and accessories
β’ Civil works, structural modifications, and support fabrication
β’ Government approvals, statutory fees, and utility charges
β’ Major materials and equipment procurement
β’ βΉ25,000 β βΉ5,00,000+ (depending on system rating and project scope)
β’ Site Inspection Charge: βΉ2,000 β βΉ10,000 (adjustable if work proceeds)
β’ Final cost depends on busbar capacity, protection requirements, site conditions, and project complexity
β’ Customer must provide approved drawings, equipment, and site access.
β’ Major equipment, materials, and accessories are charged separately unless specifically included in the quotation.
β’ Additional work beyond the agreed scope will be quoted separately and executed only after approval.
β’ Service charges may vary based on system capacity, site conditions, and project requirements.
β’ Government approvals, inspections, and statutory fees are not included unless specified.
β’ ELTO is not responsible for manufacturing defects, equipment failures, or pre-existing site issues.
β’ Inspection findings and final technical assessment shall be considered final for execution.
β’ Payment shall be made as per agreed project milestones or contract terms.