β’ Switchyard equipment installation
β’ Structure erection and equipment mounting
β’ Installation of isolators, circuit breakers, CTs, PTs, and lightning arresters
β’ Busbar installation and interconnections
β’ Earthing and lightning protection works
β’ Testing, commissioning, and safety checks
β’ Engineering and technician labor charges
β’ Installation and commissioning services
β’ Testing and basic safety verification
β’ Minor consumables required for service
β’ Cost of switchyard equipment, structures, conductors, and accessories
β’ Civil works, foundations, trenches, and structural modifications
β’ Government approvals, statutory fees, and utility charges
β’ Major materials and equipment procurement
β’ βΉ1,00,000 β βΉ15,00,000+ (depending on voltage level and project scope)
β’ Site Inspection Charge: βΉ5,000 β βΉ25,000 (adjustable if work proceeds)
β’ Final cost depends on switchyard capacity, equipment, site conditions, and project complexity
β’ Customer must provide approved drawings, statutory clearances, and site access.
β’ Major equipment, materials, and accessories are charged separately unless specifically included in the quotation.
β’ Additional work beyond the agreed scope will be quoted separately and executed only after approval.
β’ Service charges may vary based on site conditions, accessibility, and project requirements.
β’ Government approvals, inspections, and statutory fees are not included unless specified.
β’ ELTO is not responsible for manufacturing defects, utility-related delays, or pre-existing site issues.
β’ Inspection findings and final technical assessment shall be considered final for execution.
β’ Payment shall be made as per agreed project milestones or contract terms.