Scope of Work

β€’ Substation design and engineering
β€’ Equipment layout and installation planning
β€’ Installation of transformers, HT/LT panels, and switchgear
β€’ Cable routing, termination, and interconnections
β€’ Earthing and lightning protection works
β€’ Testing, commissioning, and safety checks

Covered

β€’ Engineering and technician labor charges
β€’ Installation and commissioning services
β€’ Testing and basic safety verification
β€’ Minor consumables required for service

Not Covered

β€’ Cost of transformers, panels, switchgear, cables, and accessories
β€’ Civil works, foundations, trenches, and structural modifications
β€’ Government approvals, statutory fees, and utility charges
β€’ Major materials and equipment procurement

Service Cost

β€’ β‚Ή1,00,000 – β‚Ή10,00,000+ (depending on capacity and project scope)
β€’ Site Inspection Charge: β‚Ή5,000 – β‚Ή25,000 (adjustable if work proceeds)
β€’ Final cost depends on voltage level, equipment, site conditions, and project complexity.

Terms & Conditions

β€’ Customer must provide approved drawings, statutory clearances, and site access.
β€’ Major equipment, materials, and accessories are charged separately unless specifically included in the quotation.
β€’ Additional work beyond the agreed scope will be quoted separately and executed only after approval.
β€’ Service charges may vary based on site conditions, accessibility, and project requirements.
β€’ Government approvals, inspections, and statutory fees are not included unless specified.
β€’ ELTO is not responsible for manufacturing defects, utility-related delays, or pre-existing site issues.
β€’ Inspection findings and final technical assessment shall be considered final for execution.
β€’ Payment shall be made as per agreed project milestones or contract terms.