β’ Chemical earthing installation
β’ Conventional earthing installation
β’ Earthing pit construction and electrode installation
β’ Earthing conductor and connection works
β’ Earth resistance testing
β’ Inspection, testing, and system verification
β’ Technician/Engineer labor charges
β’ Installation and testing services
β’ Earth resistance measurement
β’ Minor consumables required for service
β’ Cost of electrodes, earthing compounds, conductors, and accessories
β’ Excavation, concrete work, and major civil works
β’ Structural modifications and restoration works
β’ Government approvals and statutory inspections
β’ βΉ5,000 β βΉ50,000 per earthing point (depending on type, soil condition, and project scope)
β’ Site Inspection Charge: βΉ1,000 β βΉ3,000 (adjustable if work proceeds)
β’ Final cost depends on earthing type, site conditions, soil resistivity, and material requirements
β’ Customer must provide site access and required permissions for execution.
β’ Earthing electrodes, compounds, conductors, and accessories are charged separately unless included in the quotation.
β’ Excavation and civil works may be charged separately depending on site conditions.
β’ Additional work beyond the approved scope will be quoted separately.
β’ Service charges may vary based on soil conditions, depth requirements, and project complexity.
β’ ELTO is not responsible for performance issues arising from future site alterations or external environmental conditions.
β’ Inspection findings and technical recommendations provided by ELTO shall be considered final.
β’ Payment must be completed as per agreed project milestones or contract terms.